5. Installation

5.1 Optimum installation

1i
Fig. 2
Example of optimum installation
Pos.
Components
1i
Dosing tank
2i
Electric agitator
3i
Extraction device
4i
Suction pulsation damper
5i
Dosing pump
6i
Relief valve
7i
Pressure loading valve
8i
Pulsation damper
9i
Measuring glass
10i
Injection unit

5.2 Installation tips

For easy deaeration of the dosing head, install a ball valve
(11i) with bypass line (back to the dosing tank) immediately
after the discharge valve.
In the case of long discharge lines, install a non-return valve
(12i) in the discharge line.
11i
Fig. 3
Installation with ball valve and non-return valve
12
2i
4i
3i
12i
8i
9i
7i
10i
Max. 1 m
max. 1m
6i
5i
When installing the suction line, observe the following:
– Keep the suction line as short as possible. Prevent it from
becoming tangled.
– If necessary, use swept bends instead of elbows.
– Always route the suction line up towards the suction valve.
– Avoid loops which may cause air bubbles.
Fig. 4
Installation of suction line
For non-degassing media with a viscosity similar to water, the
pump can be mounted on the tank (observe the maximum
suction height).
Flooded suction preferred.
For media with a tendency to sedimentation, install the suction
line with filter (13i) so that the suction valve remains a few
millimetres above the possible level of sedimentation.
6i
13i
Fig. 5
Tank installation
p
10i