Complete The Installation - Kohler K-2974 Guía De Instalación Y Cuidado

Válvula de control de caudal
Ocultar thumbs Ver también para K-2974:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Direction of Water Flow
Install with arrow pointing
in direction of water flow.
Mixed Water Supply Line

Complete the Installation

Flush the mixed water supply line to remove any debris.
Use thread sealant and connect the mixed water supply line to
the valve inlet port. The valve is marked with an arrow to
identify the required water flow direction.
Connect the water outlet line to the valve.
Secure the water supply tubing to the support framing.
Secure the valve with screws as shown.
IMPORTANT! Finished wall surface should not extend beyond the
installed plaster guard.
Complete the finished wall.
Turn on the water supply to the volume control valve and check
for leaks.
Turn off the water.
Remove and discard the plaster guard.
Warranty
KOHLER
Faucet Lifetime Limited Warranty
®
Kohler Co. warrants its Faucets* manufactured after January 1, 1997, to
be leak and drip free during normal residential use for as long as the
original consumer purchaser owns his or her home. If the Faucet
should leak or drip during normal use, Kohler Co. will, free of charge,
1205547-2-A
Water Outlet Line
Screw (not provided)
Inlet
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-2977

Tabla de contenido