Setting Up The Basic Unit; Start-Up; Installing The Heating Bath - Heidolph Hei-VAP Precision Instrucciones De Funcionamiento Originales

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.
Switch off the unit.
5.
Remove the plug.
6.
Package the unit.
CAUTION
Vibrations and shocks!
Damaging the housing and the mechanical system of the equip-
ment.
Avoid vibrations and shocks.
Carry the basic unit from below.

4.3 Setting up the basic unit

Chemicals may reach the atmosphere (via the pump) when handling hazardous mate-
rials and distilling solvents.
Verify that harmful fumes or gases do not affect the operating personnel. The pump
exhaust air must be channeled to an exhaust hood or condensate condenser.
Verify that the interior and exterior pressure variance equals no more than 2 bar.
Avoid setting up the rotary evaporator in corrosive atmospheres.
This reduces the service life of the equipment.
CAUTION
Tilting the heating bath!
Damaging the housing and risk of injuries.
Place the basic unit on a solid level surface with sufficient
room.
Select a level, solid, and heat resistant surface.

4.4 Start-up

4.4.1

Installing the heating bath

The basic unit is located on a suitable place.
Figure 4-2: Heating bath
1
Heating bath
Hei-VAP Precision
2
Base plate
Set-up and Start-up
Where?
Start-up
Installing the heat-
ing bath
1
2
EN
15

Publicidad

Tabla de contenido
loading

Tabla de contenido