Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes to review this manual before
you start installation. If you encounter any installation or performance problems, please don't hesitate to
contact us. Our phone numbers and website are listed on the back cover. Thanks again for choosing Kohler
Company.
Recommended Tools and Materials
Silicon Sealant
Introduction
Please read these instructions carefully to familiarize yourself with the required tools, materials, and
installation sequences. Follow the sections that pertain to your particular installation. This will help you
avoid costly mistakes. In addition to proper installation, read all operating and safety instructions.
All information in this manual is based upon the latest product information available at the time of
publication. At Kohler, we constantly strive to improve the quality of our products; we therefore reserve the
right to make changes in product characteristics, packaging, or availability at any time without notice.
Before You Begin
Your bath is designed for drop-in island installation. Undermount and alcove installations are also
possible.
You must install the bath onto an adequately supported, level subfloor.
Provide properly dimensioned framing.
Choose a fill spout which will provide adequate reach and a minimum 2" (5 cm) air gap above the
bathing well rim of the overflowing bath. You may need to build up the deck material to obtain
adequate air space because the outer rim may be lower than the bathing well rim depending on the
specific area of the bath.
Follow local plumbing codes.
The bath must be filled with water through the bathing well, not the overflow channel.
If you plan to install a deck-mounted, hand-held shower, the diverter vacuum breaker must
maintain a minimum 1" (2.5 cm) air gap above the outer rim.
When using the K-922 or K-923 Laminar Bath Spout with drip tray K-924, the distance from the
finished wall to the outside wall of overflow channel should not exceed 2" (5 cm).
1019731-2-B
4' (1.2 M)
Tape
Level
Measure
Safety
Pencil
Glasses
4
• Conventional woodworking
tools and materials
• Drop cloth
• 2x4's or 2x6's
Kohler Co.