Pre-Installation (continued)
MATERIALS REQUIRED (NOT INCLUDED)
NOTE: Hardware not shown to actual size.
Part
Description
AA
Threaded adapter (Pipe to Pump)
BB
2 in. ABS or PVC pipe
CC
Thread tape
DD
Ball valve
AA
EE
Quantity
BB
FF
Part
1
EE
1
FF
1
GG
1
6
CC
Description
2 in. Check valve
ABS or PVC cement (to match the pipe)
2 in. 90° Elbow
DD
GG
Quantity
1
1
1