Desert-cooler: DCP30; DCP30 Top4
H
C
YDRAULIC
IRCUIT
BEFORE START UP
1)
All the below mentioned parts
of the hydraulic kit are supplied
separately in order to avoid damages
during transportation. Along with the
kit a Teflon roll is supplied. We
recommend using it as sealant when
connecting each threaded joint, to
ensure its tightness.
2)
Assemble the pump (16) on the
stainless steel plate located on the tank
with 4 (four) M6x20 screws and their
relative washers and nuts.
3)
Fix the joint 1-3/4 (08) in the
threaded hole present on the tank.
4)
Assemble the water filter exit
(11) to the "T" joint (10) then fix them
to the 1-3/4 joint (8) already fixed to
the tank.
5)
Screw on the water filter
entrance (11) the ¾ joint (12) and on
this latter the ¾ tube joint (13).
6)
Position two fixing strips (14)
on the short plastic tube (15) and insert the tube respectively on the central part of the pump (16) and on the ¾
tube joint (13). Tighten the fixing strips at both ends of the short plastic tube.
7)
Screw in the ¾ valve (18) on the elbow joint (19), then screw in the ¾ tube joint (13) on the other side of
the ¾ valve.
8)
Screw the parts so far assembled to the terminal part of the water distribution tube, located on the upper
side of the machine, corresponding to a circular opening on one of the support uprights.
9)
Position two fixing strips (14) on the long plastic tube (17) then insert the tube respectively on the lateral
exit of the water pump (16) and on the ¾ tube joint (13). Tighten the two fixing strips at both ends of the long
plastic tube.
10)
Fix the water discharge spout (09) on the "T" joint (10).
11)
Assemble the pump cover (26) with two self threading screws.
12)
At this point the hydraulic kit assembly is finished; compare the obtained result with the figure.
HC/MIT/UgGB-0599-02/06
2006
A
SSEMBLY
11(96)