• Remove the electric cables that are hook up to it and proceed to its removal.
Desert-cooler: DCP30; DCP30 Top4
• Install the new component and hook it up according to the figure in attachment 3.
• Close the panel.
N
:
OTE
THIS OPERATION SHOULD BE EFFECTED BY PERSONNEL WITH THE QUALIFICATION OF ELECTRICIAN
RESTARTING IN CASE OF SHUTOFF
Shutoff due to power failure on the line:
low danger
Cause: power failure.
Status following shut off: the DCP resets itself automatically.
Magnetothermal switch status check
N
:
OTE
THIS OPERATION SHOULD BE EFFECTED BY PERSONNEL WITH THE QUALIFICATION OF ELECTRICIAN
1) Open the electrical panel by untighening the 4 screws.
2) Verify that there is no electrical continuity between the corresponding terminals, up circuit or down
circuit from the magnetothermal switch. In that case that there is continuity, substitute the switch.
3) Close the panel.
MAINTENANCE AND CLEANING
A periodic maintenance of the water tank is necessary, especially if the DCP operates in very dusty environments.
As a good norm it is recommended to verify the machine's conditions and to clean it once a year, during
the machine's shut off period.
Tank and filter cleaning:
Follow this procedure:
1) Shut off the water intake faucet.
2) Point a jet of water (NON HYDRO CLEANING) towards the humidifying panels to remove the salt
and water deposits. If necessary use a medium bristle brush and a jet of compressed air.
3) Unscrew the plug from the "T" joint on the plastic tank.
4) Drain the water that is present. To facilitate the operation tilt slightly the machine in the direction of the
water flow.
5) Fill the tank with clean water and repeat the operation until the drained water is clean.
6) Remove the filter cartridge and clean it.
HC/MIT/UgGB-0599-02/06
2006
.
.
19(96)