with the eight self-tapping screws
provided;
– assemble the upper rear panel (8)
with the six self-tapping screws
provided;
– fix the control panel (12) to the
angle bars using the four screws
provided.
For vers. "GG GHP", fix the left
bracket (1) using three self-tap-
ping screws and the right bracket
(1), before installing the control
panel, to the side parts and angle
bars;
– unwind the capillary tubes of the
two thermostats and thermo-
meter by inserting their sensors
inside the sheath (11), securing
KEY
L
Line
N
Neutral
IG
Main switch
TS Safety stat
TC Boiler stat
SA Green voltage LED
P
C.H. pump
B
Direct Feeding Burner (not supplied)
28
the assembly in position using
the capillary tube retaining spring
provided;
– complete assembly by fixing the
cover (10) and the front panel (9)
to the side parts.
NOTE:
Remove
the
Certificate" from inside the com-
bustion chamber and keep toge-
ther with the instructions manual.
2.7
ELECTRICAL CONNECTION
(fig. 9 )
The boiler is fitted with an elec-
tricity cable, and requires a a sin-
B1 Permanent Feeding Burner (not supplied)
TA Room stat
OP Programmer's clock (optional)
NO TE: When a room stat is to be fitted remove the link betwe-
en terminal 4 and 5 on the connector plug.
To connect the programmer's clock (OP), remove the link
between terminals 5 and 8.
gle-phase power supply of 230V
- 50Hz through the main switch
protected by fuses.
The room thermostat (required
for enhanced room temperature
control) must be connected to the
terminals 4-5 after removing the
"Testing
link. Connect the burner cable
supplied.
NO TE: Device must be connected
to an efficient earthing system.
CLIMIT de cli nes all responsibility
for injury caused to persons due to
failure to earth the boiler.
Always turn off the power supply
before doing any work on the elec-
trical panel.
NOTE: The brown (capped off)
cable has to be exclusively
used in case of permanent
feeding burners (type B1).
Fig. 9