TASK 5: CONNECTING THE POWER
Plug in the power cables on all power supplies.
Important
If you have a SAN, DAS, or Cascade with JBOD Expansion, always power on the JBOD subsystems first.
The Vess R2600 and Vess J2600 enclosures can be equipped with up to four power supplies for each unit. A minimum of two operating
power supplies are required for normal function of both the Vess R2600 and Vess J2600. The standard shipment includes three power
supplies. Contact your vendor for information on additional power supplies.
Figure 19: Vess R2600fiD rear panel power connections
Important
For information about installing or hot swapping power supplies, please see the product manual.
Figure 20: Vess J2600sD
Important
The Vess R2600 and Vess J2600 are equipped with LED indicators on the cooling units and power supplies. Check
these after powering the devices on to make sure the cooling and power status for the enclosure is normal.
PSU1, PSU2 and PSU3 are installed on
both the Vess R2600 and Vess J2600.
Connect all power supplies to a suitable
power source.
PSU1, PSU2 and PSU3 are installed on
both the Vess R2600 and Vess J2600.
Connect all power supplies to a suitable
power source.
An optional fourth power supply
(PSU4) can be installed in this bay.
See the product manual for more in-
formation on installing and
swapping power supplies.
13
An optional fourth power supply
(PSU4) is available.