Figure 4: Vess R2600iD rear view
PSU 1
Figure 5: Vess J2600sD with optional four power supplies - rear view
PSU 1
TASK 2: MOUNTING Vess R2600 IN A RACK
The instructions here apply to the Vess R2600 and Vess J2600 series.
Caution
* Do not populate any unit with hard drives until it has been securely installed in the rack.
* At least two persons are required to safely lift, place, and attach the Vess R2600 or Vess J2600 unit into a rack system.
* Do not lift or move the Vess R2600 or Vess J2600 unit by the handles, power supplies or the controller units. Hold the
subsystem itself.
* Do not install the Vess R2600 or Vess J2600 unit into a rack without rails to support the subsystem.
* Only a qualified technician who is familiar with the installation procedure should mount and install the Vess R2600 or Vess
J2600 unit.
* Mount the rails to the rack using the appropriate screws and flange nuts, fully tightened, at each end of the rail.
* Do not load the rails unless they are installed with screws as instructed.
* The rails available for the PROMISE Vess R2600 or Vess J2600 unit are designed to safely support that PROMISE Vess
R2600 or Vess J2600 unit when properly installed. Additional loading on the rails is at the customer's risk.
* PROMISE Technology, Inc. cannot guarantee that the mounting rails will support your PROMISE Vess R2600 or Vess
J2600 unit unless you install them as instructed.
Controller modules
Unit 1
Cooling units
PSU 2
Unit 1
with battery
Power supplies
(Vess J2600 and Vess R2000 series are
shipped with 3 power supplies installed.)
Controller modules
Unit 1
Cooling units
PSU 2
Unit 1
Power supplies
(Vess J2600 and Vess R2000 series are
shipped with 3 power supplies installed.)
Unit 2
PSU 3
Unit 2
with battery
Unit 2
PSU 3
Unit 2
6
Optional
PSU 4
Optional
PSU 4