1
5
4
t
t
t
t
t
2
t
3
t
t
t
t
t
Attaching the Cable Entry
Please use extreme caution when performing any work on the equipment
that affects this cable gland.
You must use a torque wrench.
The torque for this cable gland is 5 Nm.
Remove the protective caps from the bore hole on the indicator.
Insert the included cable gland through the bore hole and secure from the
inside using the locknut (1).
Remove the cover plate by removing the 4 screws.
Connection terminals are now visible.
Before the front panel is mounted using the cover plate
and fix it.
Insert the cable through the cable gland until the shielding (2) comes into
contact with the clamps (3). Tighten the screw-down nut (4) until the gasket
(5) inserted between the screw-down nut and cable forms a small beaded
rim.
Check the shielding and clamps.
Securely connect the wires of the connecting cable in accordance with the
terminal assignments.
Connecting the Cable to the Analog/Digital Converter (ADC)
Insert all cable wires through the ferrite case, wind them around the ferrite
case and then reinsert back through the ferrite case.
Screw the wires tightly into the clamps.
Pin Assignment
Refer to the data sheet or operating instructions of the weighing platform
for details on the assignment of wire colors/signals. Ensure any lines that are
not assigned are insulated correctly.
Connect weighing platform to ADU, Option A15
1 EXC+
blue
2 Sense+
green
3 OUT+
white
4 OUT-
red
5 Sense-
gray
6 EXC-
black
When connecting a load receptor that uses 4-conductor technology (the
cable of the weighing platform to be connected only has 4 lines), connect
clamp pairs 1 and 2 (EXC+ and SENSE+), and 5 and 6 (SENSE- and EXC-)
with a wire jumper.
Getting Started
Installationsanleitung CAIXS2
7