Installation And Start-Up; Important - Ugin ARTIS Modo De Empleo

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 76

INSTALLATION AND START-UP

When unpacking the furnace, check that it is in perfect condition and notify the shipper and
supplier of any damage.
Remember to have the deliveryman sign the shipping bill, after marking down any reservations
you may have, and to confirm the letter by registered mail with acknowledgment of receipt.
INSTALLATION
Install the furnace in a well-ventilated area and make sure it is at least 10 cm from walls or other
surfaces.
IMPORTANT: We recommend that the furnace be operated on a separate electric circuit.
START-UP
Connect the vacuum pump socket
Plug the vacuum hose into the connector
After checking that the mains voltage matches that noted on the rating plate
into a standard 10/16 A socket with a ground terminal.
Turn on the main switch
Press the
ROUGHLY 5 MINUTES).
Put the refractory base on the platform.
You may now set the program parameters.
NOTE: the furnace is delivered with the display screen in "French"
To modify this parameter push simultaneously on
LANGUE OPERATEUR:
VEILLE
With the key
0
FRENCH
3
ENGLISH
4.
1
, you will hear a beep.
key (FRONT PANEL). The platform moves down, stopping in low position (FOR
:
300° C
or
choose the language needed and enter by pressing
1
GERMAN
4
ITALIAN
3.
and
0
2
SPANISH
5
FRENCH
21
5.
, plug the cord
Flashing
ARTIS

Publicidad

Tabla de contenido
loading

Tabla de contenido