Packing and unpacking
The machine is packaged in cardboard with
polyester foam inserts to guarantee full
integrity during transport.
•
Handle the packaging according to the
instructions.
•
Open the packaging and check the
integrity of all components. Keep
packaging for future moves.
•
Lift the machine as indicated and
place it in the installation area.
Installation area
The arranged area must be suitably illuminated and an electrical socket must be available. The resting
surface must be sufficiently ample, even and dry. The machine must be installed in rooms with non-explosive
environments. In any case, installation must also be performed in consideration of the work safety laws in
force.
Room conditions table
Descriptions
Working temperature
Storage temperature
Relative humidity
Dustiness
Electrical connections
DANGER – WARNING: Electrical connections to
the supply mains must be performed by specialised
Verify the efficiency of the grounding system in the building.
Make sure that line voltage (V) and frequency (Hz) correspond
to those of the machine (See the identification plate and wiring
diagram). The machine is equipped with an electrical cord that
connects to a multi-polar plug. The plug is to be connected to a
wall switch equipped with a circuit breaker.
Three phase connection
Start the machine and run for several seconds to make sure the
upper tool rotates correctly. If this is not the case, disconnect the
power supply and invert two of the three phases in the plug.
Maximum 50% with room temperature between 20÷60 °C
personnel.
INSTALLATION
INFORMATION
Values
0÷35 °C (32÷95 °F)
-15 to +65 °C (from –6.8 to +149 °F)
Maximum 80% with 20 °C room temperature
Less than 0.03 g/m³
Single-phase
Three-phase
Connection
Connection
230V – 1Ph
230/400V – 3Ph
2