INSTALLATION

2.1

BOILER ROOM

The boiler room should feature
all the characteristics required by
standards
governing
heating systems.
2.2

BOILER ROOM DIMENSIONS

Position the boiler body on the foun-
dation bed, which should be at least
10 cm high. The body should rest on
a surface allowing shifting, possibly
by means of sheet metal. Leave a
clearance between the boiler and
the wall of at least 0.60 m, and
between the top of the casing and
the ceiling of 1 m (0.50 m in the case
of boilers with incorporated D.H.W.
tank). The ceiling height of the boiler
room should be less than 2.5 m.
2.3

CONNECTING UP SYSTEM

When connecting up the water sup-
ply to the boiler, make sure that
the specifications given in fig. 1 are
observed. All connecting unions
should be easy to disconnect by
means of tightening rings. A closed
expansion tank system must be
used.
ATTENTION: The installation of a
by-pass or a flow switch (not sup-
plied) is mandatory in the case of
installations in systems with ther-
mostatic valves or motorized two-
way valves.
The minimum flow rate of the sy-
stem, which must be guaranteed,
must not be lower than that shown
below.
Minimum system flow rate 850 (l/h)
with ΔT = 35 ° C
2.3.1 Accessories (fig. 2)
To ensure boiler efficiency, and a
pressure relief valve set to 3 bar/294
kPa (14) and a hydrometer to check
the system pressure (16).
Install a pressure relief valve cali-
brated to 6 bar/588 kPa (7) on the
boiler water outlet pipe to prevent
the risk of bursting due to excess
pressure build up. If the boiler safety
valve cuts in frequently, install a
5-litre expansion vessel (15) with
maximum operating pressure of 8
bar/784 kPa on the hot water circuit.
The tank should be fitted with a nat-
ural rubber food-grade diaphragm.
The central heating circuit pump
34
(4) can be installed at the rear of
the boiler in place of the connection
union 1" pos. 3 fig. 4/a.
2.3.2 Filling the water system
liquid
fuel
Before connecting the boiler,
thoroughly flush the system to
eliminate scale which could dam-
age the appliance.
Filling must be done slowly so as to
allow any air bubbles to be bled off
through the air valves.
In closed-circuit heating systems,
the cold water filling pressure and
the pre-charging pressure of the
expansion vessel should be no less
than or equal to the height of the
water head of the installation (e.g.
for water head of 5 meters, the
vessel pre-charging pressure and
installation filling pressure should
be at least 0.5 bar).
2.3.3 D.H.W. production
During the preparation of hot water,
the circulating pump installed on the
boiler circuit remains in operation
until the boiler thermostat probe
detects the pre-selected value.
Once the boiler thermostat has
reach the set point, and the selec-
tor has been set to winter opera-
tion with the room thermostat on
demand, the central heating circuit
pump (not supplied) can be actu-
ated.
All residual air in the boiler coils
must be bled at the first start-up to
ensure proper operation.
To facilitate this operation, position
the slot of the release screw on the
check valve horizontally (6 fig. 2).
Once the air has been bled, return
the screw to its original position.
Hot water for sanitary use is pre-
1
pared by the boiler in AISI 316L
stainless steel, which is fitted with
a
special
spiral-shaped
steel heat exchanger, a magnesium
anode to protect the boiler and an in-
spection flange to simplify checking
and cleaning.
2.3.4 Characteristics
of feedwater
To prevent lime scale and damage to
the tap water exchanger, the water
supplied should have a hardness of
no more than 20°F.
In all cases the water used should be
tested and adequate treatment devi-
ces should be installed.
To prevent lime scale or deposits on
the primary exchanger, the water
used to supply the heating circuit
should must be treated in accordan-
ce with UNI-CTI 8065 standards. The
water used for the central heating
system should be treated in the fol-
lowing cases:
– For extensive systems (with high
contents of water).
– Frequent addition of water into the
system.
– Should it be necessary to empty
the system either partially or
totally.
2.4

CONNECTING UP FLUE

The flue is of fundamental importance
for the proper operation of the boiler;
if not installed in compliance with the
standards, starting the boiler will be
difficult and there will be a consequent
formation of soot, condensation and
encrustation.
A flue therefore must satisfy the fol-
lowing requirements:
– be constructed with waterproof
materials and resistant to smoke
KEY
1 Drain hose
2 Condensate drain tap
2
stainless
Fig. 5