M 3...7-O
Installation
2. Installation
Installation, initial operation and maintenance of this appliance must only be con-
ducted by an authorised professional, who will then be responsible for adherence to
EN
applicable standards and installation regulations. We assume no liability for any damag-
es caused by failure to observe these instructions!
2.1 Typical installation: over-sink installation M/SMB
Fig. 3: "Installation diagram with SMB tap" (dimensions in mm)
2.2 Installation instructions
The heater is installed directly on the SMB or SME special tap. We guarantee trouble-free oper-
ation of the instantaneous water heater only if CLAGE fittings and accessories are used. Note
the following during installation:
• Installation must comply with DIN VDE 0100 and EN 806 and with the statutory regulations
of the country and the provisions of the local electricity and water supply company.
• Check the technical data and information on the rating plate.
• Easy access to the instantaneous water heater must be guaranteed at all times for mainte-
nance purposes. An separate shut-off valve must be installed.
• Only use the appliance with an open-outlet tap.
• Ensure that all accessories are removed from the packaging.
• The water pipe must be securely embedded in the wall and it must be stable.
• The minimum requirements for the required water resistance must be complied with. The
required water resistance of the can be obtained from your water supply company.
• The minimum requirements for the required water resistance must be complied with. The
required water resistance of the can be obtained from your water supply company.
20