ATH M126 Manual Del Usuario página 67

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 180
Fixing
It is recommended that the machine is secured to the floor at the three points provided using M12x50
anchor screws and the corresponding dowels.
The gradient in the installation area should not exceed 10 mm. Dowels should be installed at a distance of
200 mm from cracks, edges and expansion joints. If these conditions cannot be met, a foundation must be
cast to support the machine.
Drill holes, observing
the necessary drill
depth A and drill
diameter of the dowel
manufacturer
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Clean out the inside of
the holes
Manufacturer ATH-Heinl GmbH & CO.KG
Insert the anchor bolts
into the holes until they
have reached an
appropriate depth.
- 21 -
Tighten the nuts to the
torque specified by the
manufacturer
Clamping thickness B
varies depending on the
floor covering

Publicidad

Tabla de contenido
loading

Productos relacionados para ATH M126

Tabla de contenido