The suspension eye of the load lifting attachment must have sufficient space in the crane hook
and be freely articulating.
In the case of malfunctions, stop using the load lifting attachment immediately.
I
O
NCORRECT
PERATION
(list not complete)
Do not exceed the rated load capacity (WLL) of the unit.
Only cable drums with a centre hole diameter and drum flange thickness suitable for the load
lifting attachment must be picked up.
The load lifting attachment is not suitable for cable drums fitted with a tube axle.
Any modifications of the load lifting attachment are prohibited.
It is forbidden to use the load lifting attachment for the transportation of persons.
When transporting loads ensure that the load does not swing or come into contact with other
objects.
Only one cable drum may be transported at a time with the load lifting attachment pair.
The unit itself must never be used as a means for attaching ropes, chains or belts.
Do not allow the load lifting attachment to fall from a large height.
The unit must not be used in potentially explosive atmospheres.
I
B
NSPECTION
EFORE
According to national and international accident prevention and safety regulations load lifting
attachmentt must be inspected:
• in accordance with the risk assessment of the operating company,
• prior to initial operation,
• before the unit is put into service again following a shut down
• after substantial changes,
• however, at least once per year, by a competent person.
Attention: Actual operating conditions (e.g. operation in galvanizing facilities) can
dictate shorter inspection intervals.
Repair work may only be carried out by specialist workshops that use original TIGRIP spare
parts. The inspection (mainly consisting of a visual inspection and a function check) must
determine that all safety devices are complete and fully operational and cover the condition of
the unit, suspension, equipment and supporting structure with regard to damage, wear,
corrosion or any other alterations.
Initial operation and recurring inspections must be documented (e.g. in the CMCO works
certificate of compliance).
If required, the results of inspections and appropriate repairs must be verified.
Paint damage should be touched up in order to avoid corrosion. All joints and sliding surfaces
should be slightly lubricated. In the case of heavy contamination, the unit must be cleaned.