Ceiling Fan Assembly - Emerson ION ECO CF5300BS00 El Manual Del Propietario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.1
Remove the Hanger Ball by loosening the Phillips Head
Set Screw in the Hanger Ball until the Ball falls freely down
the Downrod (Figure 1).
Remove the Pin from the 6" Downrod, then remove the
Hanger Ball (Figure 1).
Retain the Pin and Hanger Ball for reinstallation in
Step 3.8.
NOTE: Do not loosen the Screw holding the Green
Ground Wire.
3.2
Separate, untwist and unkink the two 80" Motor Leads.
Route the 80" Black and White Motor Leads through the
6" Downrod (Figure 2).
3.3
Loosen the two Phillips Head Set Screws in the Motor
Coupler for installation of the 6" Downrod (Figure 3).
Seat the 6" Downrod in the Motor Coupler (Figure 3).
Rotate and align the Downrod holes with all the holes in
the Motor Coupler (Figure 3).

3. Ceiling Fan Assembly

5
PIN
PHILLIPS HEAD SET SCREW (LOOSENED)
Figure 1
TWO 80" MOTOR LEADS (UNTWISTED)
Figure 2
LOOSEN
PHILLIPS HEAD
SET SCREWS (2)
Figure 3
GREEN GROUND WIRE
GREEN GROUND
WIRE SCREW
6" DOWNROD
HANGER BALL
6" DOWNROD
6" DOWNROD
MOTOR COUPLER

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ion eco cf5300grt00Ion eco cf5300orb00Ion eco cf5300sw00

Tabla de contenido