All manuals and user guides at all-guides.com
4 - Testing, transport, delivery, and installation
4.1 - Testing
The machine you have purchased has been tested on our premises to ensure it is
correctly running and regulated.
4.2 - Delivery and moving the machine
All the material shipped has been carefully checked before delivery to the
forwarding agent. Unless otherwise stipulated by the client or hindered by
particularly burdensome transport, the machine is packaged on a pallet and
wrapped in cardboard. Upon receipt of the machine check that the packaging is
intact. Should the packaging be damaged, sign the shipping agent's transport
documents, noting that, for example: " I accept, but ..." and the reason. Once the
package has been opened, should it be found that components of the machine
have truly been damaged, declare such damage to the shipping agent within three
days of the date indicated on the transport documents.
4.3 - Installation
ATTENTION!
The area in which you wish to install the machine must be solid and the surface it
rests on must guarantee safe support.
Furthermore, it is ncessary to position the machine, leaving ample space around it.
This allows for better maneuvrability while working and guarantees access for
periodic maintenance.
Ensure that there is sufficient lighting around the machine to guarantee good
visibility for the operator of the meatgrinder.
4.3.1 - Package disposal
Package components such as cardboard, nylon and wood are compatible with
solid urban waste and can therefore be disposed of freely. Nylon is a pollutant
material; if burned it produces toxic fumes. Do not burn and do not dispose of in
the environment but dispose of according to laws in force. If the machine is
delivered in countries in which there are no particular laws, dispose of the
packaging according to what is prescribed by the laws in force.
4.3.2 - Moving the machine
ATTENTION!
Handle the machine carefully and with extreme ATTENTION, avoiding that it
accidentally falls, which could seriously damage it. Due to the solid weight of the
machine, at least two people are required for moving it.
4.4 - Connecting the electrical system
ATTENTION!
Check that the electrical supply line corresponds with the data reported on the
machine identification plate.
Each intervention must be carried out only by qualified personnel who are
expressly authorized. Make the connection to a network outfitted with an efficient
floor plug.
13