SLEEPING WELL 1000
SLEEPING WELL 1000
GENERAL WARNINGS
When installing, be sure to follow carefully the instructions given in this manual.
The manufacturer declines all responsibilities for damage to equipment or people caused by non-standard system
installations or modifications.
On the evaporator template supplied together with the assembly set, are indicated, besides the slotted holes for fastening
the evaporator, 2 Ø60 and Ø20 holes for the connections plate and the draining of condensed water. Make sure there are no
obstructions or obstacles on the spots where these 2 HOLES WILL BE MADE.
The distance between the evaporator block (inside the cabin) and the condenser block (on the outside) depends on the
length of the connection copper hose
EVAPORATOR ASSEMBLY - PRELIMINARY OPERATIONS
CHOOSE THE BEST POSITION FOR ASSEMBLING THE EVAPORATOR BLOCK
N THE PRESENCE OF REINFORCING RIBS OR CROSSBARS behind the inner panelling (SEE FIG.1 PAG.15), lay the carton
template against the back wall. CHOOSE 4 FASTENING POINTS OUT OF THE 12 slotted holes on the template, 2 ON EACH
SIDE, choosing them AS FAR AS POSSIBLE FROM EACH OTHER.
Make sure that at least the 2 UPPER fastening points (if not all 4) are placed in correspondence of a reinforcing rib.
Mark the spots on the panel and make the 4 Ø6 holes (NON FEED-THROUGH). Widen the holes sufficiently and insert the
expanding M6 bushings until they are set in the ribs.
N.B. In case, place an adequate spacer before the bushings in order to avoid the deformation of the panelling during the
fastening of the evaporator.
IN CASE THERE ARE NO REINFORCING RIBS between the panelling and the cabin's back wall (SEE FIG.2 PAG.15), after
locating the most suitable spot for the installation of the evaporator choose the fastening holes (using the provided template)
(2 ON EACH SIDE, AS FAR AS POSSIBLE FROM EACH OTHER) and make 4 Ø6 holes FEED-THROUGH.
N.B. If it is necessary, they may eventually insert some spacers with a proper height, to avoid the covering panel to become
distorted when fixing the evaporator block.
AFTER MAKING THE HOLES NEEDED TO FASTEN THE EVAPORATOR, mark the CENTRES on the template to make the
2 remaining holes (Ø60 and Ø20). Make a FEED-THROUGH Ø6 hole ONLY ON THE UPPER PART.
Operating from the outside, and with the aid of a bucket mill, widen the Ø6 hole to make it Ø60 both on the steel wall and
on the internal panel (which will then be used for the transit of the connections plate) (SEE FIG.4 PAG.15).
Operating from the inside, make a FEED-THROUGH Ø6 hole in correspondence of the LOWER CENTRE, SUITABLY
TILTING THE TOOL (SEE FIG.4 PAG.15)
N.B.: THIS PRECAUTION IS NECESSARY TO FACILITATE THE TRANSIT OF THE HOSE FOR THE DRAINING OF CON-
DENSED WATER WHICH MUST HAVE A PROPER SLOPE.
Then expand the hole made in the metal wall to Ø25 and the same wall on the inner covering panel to Ø20 (for housing
the condensation drainage pipe) (SEE FIG.4 PAG.15)
N.B.: WHILE MAKING THE HOLE PAY SPECIAL ATTENTION IN ORDER TO AVOID DAMAGING THE UPHOLSTERY.
Sleeping Well 1000_01_05/2007
Sleeping Well 1000_01_05/2007
ENGLISH
37
37