Installer Operations Checklist - Baxi PBM-i 20 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLER OPERATIONS CHECKLIST

Installer: __________________________________________ Designer: _______________________________________
Type of application:___________________________________________________________________________________
Street ___________________________________________________________________________ number _____________
City/town __________________________ Postcode/ZIP code _____________ Province/State _________________________
Unit model installed ________________________________________ Serial number _________________________________
Is there a system design? YES
Installation date: ____________________________________
Systems included:
• Winter heating AT (radiators)
• Winter heating MT (fan coil)
• Winter heating BT (radiant panels)
Mark the type of system installed and describe the components in the corresponding tables
Heating system circuit
hEAT
PUMP
K
Domestic hot water circuit
hEAT
PUMP
K
hEAT
PUMP
K
76
PBM 20÷40 EN
NO
If YES, has the system been developed completely in accordance with the design? YES
K
K
K
K
K
hEAT
PUMP
K
hEAT
PUMP
K
• Summer cooling
• DhW production
• Solar thermal installed
Storage tank
Volume [l]
Type/model
Installed?
Type/model
hot water set point:
Cold water set point:
Storage tank
with coil
Volume [l]
Type/model
Coil water
volume [l]
Coil heat
exchange area
[m
]
2
Domestic hot water set point: __________ °C
U I A
NO
K
K
K
K
K
Additional
expansion vessel
Secondary pump
__________ °C
__________ °C
Storage
Expansion
cylinder
vessel

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pbm-i 30Pbm-i 40

Tabla de contenido