MEANING OF SYMBOLS
CAUTION
WARNING
ASSEMBLY/SETTINGS
INFORMATION
EQUIPMENT AND ACCESSORIES
1.
Dust bag
2.
Endless belt
DUST EXTRACTION
Equipment of belt sander includes dust bag that helps to maintain the processed surface clean. The dust
bag can be installed on the dust outlet (3) (fig. A).
Empty the dust bag regularly, it will ensure efficient operation of the sander. It is recommended to empty
the dust bag when it is half full.
● Slide the dust bag onto the dust outlet (3) to install it.
●
Pull the dust bag gently to check if it is well fixed.
●
Deinstallation of the dust bag is similar to installation, only the sequence of actions is reversed.
INSTALLATION OF SANDING BELT
Prior to sanding belt installation ensure the switch is in the off position and that power cord is
disconnected from mains network.
● Move the sanding belt tension lever (11) to the end in the direction shown by the arrow (fig. B).
●
Put sanding belt on rollers (
●
Move the sanding belt tension lever (
Ensure the direction of the arrow located on the sanding paper back surface matches direction of the
arrow located on the belt sander body.
ADDITIONAL HANDLE
Additional handle (1) makes it easier to hold the sander safely and guide it when sanding.
It is possible to set the additional handle to a position comfortable for the work being performed.
●
Pull away the locking lever for additional handle (
●
Set the additional handle (
●
Press in the locking lever for additional handle (
SWITCHING ON / SWITCHING OFF
Before connecting the belt sander to a power supply network, always check that power supply
voltage matches rated voltage shown on the rating plate that is fixed to the power tool, and that
switch is in the off position.
During operation hold the sander firmly with both hands. Switch on the belt sander only when it is
lifted above the material that you plan to process.
Switching on – press the switch button (8) and hold in this position.
Switching off – release pressure on the switch button (8).
Locking the switch (continuous operation)
- 1 pce
- 1 pce
PREPARATION FOR OPERATION
fig. C).
11) to its original position (fig. D).
13).
1) to desired position (fig. J).
13).
OPERATION / SETTINGS
12