K2 Pumps WPD07502K Manual Del Propietário página 11

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8a.Completed shallow well installation with piping and tank
is shown (Fig. 8a)
NOTE: If a pre-charged tank becomes waterlogged, the bladder is normally leaking or broken.
1. Test the tank by depressing the air valve. The air valve will expel water if the bladder is broken.
2. Replace the tank. Once a bladder is leaking or broken, the bladder cannot be repaired. The tank must be replaced
Standard Tank (CONVENTIONAL TYPE) Connection
From step 1 to 3 is the same as Pre-Charge Tank Connection.
4. Cement 3/4in.PVC rigid Pipe into 3/4in.PVC
90-Degress S×S Elbow. Cement 3/4in. PVC MPT×S
Male Adapter into 3/4in.PVC rigid Pipe that connect
with a 3/4in. PVC FPT×FPT Union .(Fig. 4)
6. Install a short 3/4in.PVC rigid Pipe. (Fig. 6)
For Professional Technical Support call 1-844-242-2475
8b.Completed deep well installation with piping and
tank is shown (Fig. 8b)
5. Install a 3/4in. PVC MPT×S Male Adapter into the
outlet port of the pump. (Fig. 5)
7. Completed installation with piping and tank is shown
(Fig. 7)
.
11

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Wpd07501kWpd10001k

Tabla de contenido