Handpiece Experts Torque Power BL ISO Manual Del Operador página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Distributed by Handpiece Experts Inc.
Operating Instructions Torque Power BL ISO
C
A
ro D
ro D
r P
r P
e P
e P
d fo
d fo
e rc
e rc
u re
u re
m m
m m
Y 1
Y 1
fa ct
fa ct
C o
C o
, N
, N
n u
n u
2 -A
2 -A
u rg
u rg
M a
M a
8 1
8 1
n sb
n sb
d e
d e
Ö g
Ö g
62 28 527 D 3547
D 3547.201.01.01.02
6
D
12
120 V / 60 Hz
11
B
)
)
0 V
0 V
(1 2
(1 2
)
)
0 V
0 V
-0 2
-0 2
M
M
(1 2
(1 2
E2 4
E2 4
1 M
1 M
TI Y
TI Y
4 -0
4 -0
M 2
M 2
TI Y
TI Y
5
c
c
s In
s In
te m
te m
S ys
S ys
ve
ve
ri ve
ri ve
D ri
D ri
S A
S A
a rk
a rk
, U
, U
6 9
6 9
3 6
3 6
Supplementary notes for installing Torque
Power BL ISO
1
The connecting cable (6) between the transformer (11)
and the Torque Power BL ISO (1) must be run in such a
way that it can not be damaged by moving appliances
such as chairs with wheels, carts, etc.:
Place the transformer (11) directly next to the supply
unit (C).
Run the connecting cable (6) so that it does not
touch the floor anywhere. To do this, use the
adhesive cable clamps (D) supplied.
Run the connecting cable (6) in such a way that it
cannot be damaged at the supply unit.
Install the power cable (12) of the transformer as
required by the relevant national regulations.
Satellite version
Upon your request, the supplied Torque Power BL ISO
tabletop unit may be converted to a "satellite version" by
your service engineer.
Conversion kit, Order No: 60 57 223
In this version, the control panel is separated from the
Torque Power BL ISO tabletop unit and is connected to
the latter by a permanently wired cable having a length
of approx. 3 m.
The control panel (A) can be fastened at a place that is
easily accessible for the user, e.g. in the control panel
front area, either with screws (from the top) or with the
Velcro strap included in the scope of supply (from the
front).
Fastening of the control panel is done at your own risk,
make sure not to damage any cables etc. with the
screws.
The Torque Power BL ISO supply unit (B) can be
installed e.g. below the dentist element.
Establish all connections as described under
"Connection".
CAUTION
Repair and maintenance work on the Torque Power BL
ISO must be performed only by properly trained service
engineers. Before opening the housing, pull the power
plug or disconnect all poles from the power supply so as
to deenergize the unit. Wait for at least 10 seconds.
The compressed air delivered by the highspeed hand-
piece or air motor hose must be dry, oil-free and dirt-free.
It must not be contaminated!
If necessary, install a filter or water separator.
The spray water must be dirt-free according to the appli-
cable regulations. It must not be contaminated.