English
Application
Steel door station for integration in a
door side panel.
Siedle Steel for glass mountings
set directly into the glass without a
frame or any other additional fixing
elements.
For direct mounting in a glass cut
out, the cabling becomes a part of
the design concept. The supply wires
are guided downwards in a flexible
steel sleeve. The system "appears
to hover" at the ideal ergonomic
height.
The technics are accessible from
both front and back.
Electrical voltage
Mounting, installation and servicing
work on electrical devices may only
be performed by a suitably qualified
electrician.
The door station for glass mounting
may only be mounted on a surface
with finished floor covering (tiles or
similar).
Remarks
• Stainless steel and aluminium are
both based on natural raw materials.
When rolling and polishing steel/
anodizing aluminium, small hair
line irregularities can occur in the
surface. These are the result of the
normal machining process and do
not constitute material faults.
• Silicone
Do not use acetic acid interlacing sili
cone types. Corrosion hazard!
6
1 Scope of supply
a Hood
b Pipe clip
c Complete productive conduit
d Flush mounted socket
e Rear mounting plate
f Mounting plate including
mounted functional units
g Operating plate
h Mounting key
Mounting
2 Break out the flush-mounting box,
guide the supply lines through and
fix the box in the floor recess.
3 Drill 6 mm dia. fixing holes for the
socket cover as shown by the pro
vided drilling template (see page 15)
and insert dowels.
4 Release the operating panel using
the enclosed mounting key and take
it off.
5 Release the hood and set down on
one side.
6 Insert the mounting plate with
functional units from the outside
into the glass cut-out, hold the rear
mounting plate against it from the
inside and fix using the provided
screws.
7 Align the functional units and
mounting plate and screw com
pletely from behind.
8 Sealing the door loudspeaker for
glass mounting:
a Glazing tape (applied in the fac-
tory)
b All-round silicone seal on the
inside and out (to be provided by the
customer)
c Glass panel
9 Place the operating panel on the
mounting panel and lock using the
mounting key.
The marking in the mounting key
must be flush when locked with the
upper edge of the operating panel.
10 Insert the supply cable through
the protective conduit and screw the
socket cover into place on the floor.
11 Tighten the protective conduit
and fasten at the back of the
mounting plate with the pipe clip.
12 Connect in accordance with the
relevant circuit diagram.
13 Carry out a function check
14 Mount the hood from the back
and screw completely into place.
Commissioning and
programming
Commissioning and programming
are described in the relevant system
manual enclosed with the line recti
fier/server.
Servicing
Every Siedle Steel door station is
individually produced and therefore
has a unique customer order number
which is located in three places:
• On the mounting plate
• On the information for the elec
trical installer
• In the information folder for the
end customer
Please state this customer order
number in connection with all
enquiries, service callouts and spare
part orders.
We have saved all the important
characteristics of your Siedle Steel
door station under this number. This
will facilitate the troubleshooting
process and ensure that you receive
the correct spare parts.