support@nextlevelracing.com
Repeat
on Other
Main
Upright
(
)
OUTSIDE
12
Install 1 x T-Nut into the inside and front channel of the Main Uprights. Install 2 x T-Nuts into the
outside channel. Repeat on the other side.
13a
Align the through hole on the Main Uprights with the holes on the Mounting Vertical Plates previously
installed in STEP 11. Bolt through and secure with M8 Bolts, Washers and Flange Nuts.
13b
Align the T-Nuts previously installed into the Main Uprights in STEP 12 with the holes on the Mounting
Vertical Plates. Bolt through and secure with M8 Bolts and Washers.
PARTS:
• • 8 x T-NUTS
INSIDE
FRONT
OUTSIDE
• • 2 x MAIN UPRIGHTS
PARTS:
• • 2 x MAIN UPRIGHTS
• • 2 x M8 60mm BOLTS
• • 2 x M8 WASHERS
• • 2 x M8 FLANGE NUTS
PARTS:
• • 4 x M8 16mm BOLTS
• • 4 x M8 WASHERS
12
)
A
(
)
MOUNTING HOLE
(
)
MOUNTING HOLE
)
B
BACK
TOP
BOTTOM
14
A) Install 4 x T-Nuts into the back channel of the Main Cross Member.
B) Install 1 x T-Nut into the top and bottom channels of the Main Cross Member.
)
)
A
B
(
)
MOUNTING HOLE
(
)
MOUNTING HOLE
15
A) Align the through holes on the Main Cross Member with the T-Nuts previously installed in STEP 12.
B) Bolt through and secure with M8 Bolts and Washers.
16
Align the holes on the Corner Bracket with the T-Nuts previously installed in STEP 12 & STEP 14(A),
bolt through and secure with M8 Bolts and Washers. Repeat on the other side.
13
Video Instruction: bit.ly/nlrbuild
Note: For easier installation hand
PARTS:
screw M8 bolt in to T-Nut to assist
• • 6 x T-NUTS
sliding T-Nut in to channel.
• • 1 x MAIN CROSS BAR
PARTS:
• • 1 x MAIN CROSS BAR
• • 2 x M8 40mm BOLTS
• • 2 x M8 WASHERS
PARTS:
• • 2 x CORNER BRACKETS
• • 6 x M8 16mm BOLTS
• • 6 x M8 WASHERS