Commissioning - SMA INVERTER MANAGER Instrucciones De Instalación

Ocultar thumbs Ver también para INVERTER MANAGER:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5  LCS-Tool

5.1 Commissioning

1. Start up the LCS-Tool. The tool shows a list of all
identified Inverter Managers. It can take several
minutes until the LCS-Tool has identified all Inverter
Managers.
Figure 11: LCS-Tool - start screen
3. Assign a password for the user group when registering
for the first time (User and Installer). The security
status of your password is displayed.
Figure 12: LCS-Tool - checking date and time
5. In case of battery storage systems, enter the battery
details. The details under Pre-Set Battery Limits serve as
additional safety limit for battery charging and
discharging (see the battery manufacturer's manual).
24
IMVIOBOX-IA-xx-19
2. The screen now shows a list of all Inverter Managers.
To start the assistant, click on the Inverter Manager to
be configured.
4. Verify that date and time are correct. If not, set date
and time and continue.
SMA Solar Technology AG
Installation Manual

Publicidad

Tabla de contenido
loading

Tabla de contenido