5  LCS-Tool
INFORMATION
It is essential to choose the correct grid code. A
modification after the first ten operating hours have
passed is only possible with a personal SMA Grid
Guard code.
The grid code parameters can be changed
subsequently with the LCS-Tool (see
Section 5.2.11, page 37). Prerequisite is the use of
the latest version of the LCS-Tool.
Figure 15: LCS-Tool - selecting the country and grid code
☑ A list of the identified inverters of the selected Inverter
Manager is displayed.
11. Make sure that all inverters are present. It is possible to
continue the configuration of the listed inverters even if
not all inverters are detected. The undetected inverters
can always be configured later.
26
IMVIOBOX-IA-xx-19
8. Select the desired grid code from the list of options
available for the selected country.
9. To load a customer-specific country data set (JSON
file), select the Open icon under Grid code selection
(Open icon: button (A) in figure15).
10. The LCS-Tool shows a summary of the previous settings
and asks for confirmation. A wrong configuration can
be changed by clicking the [Back] button and by
changing the settings in the previous window.
☑ Inverters that have not been commissioned (no grid
code assigned) are presented with a blue square
together with their software version.
12. Select the inverters to be commissioned and select the
[Add] button.
☑ A green square identifies the commissioned inverters.
The inverters are only connected to the utility grid when
the [Start] command has been carried out from the bar
below the start menu.
SMA Solar Technology AG
Installation Manual