SMA Solar Technology AG
Figure 16: LCS-Tool - list of all inverters connected to the Inverter
Manager
13. If sufficient PV power is present and the grid code
conditions are met, the inverter starts the operation. For
battery storage systems, a successful battery start and
the fulfillment of the Grid-Code requirements is
necessary.
Figure 17: LCS-Tool - commissioning report
Installation Manual
14. During commissioning it is possible to download a
commissioning report in the Reports menu. The report
contains information about inverter settings, including
actual disconnection values for each inverter. By
clicking the folder icon in the Reports menu, it is
possible to open a folder for commissioning reports
(including grid code information).
5 LCS-Tool
IMVIOBOX-IA-xx-19