Descargar Imprimir esta página

Balanced Body The Contrology Manual Del Usuario página 5

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

TOWER PARTS LIST
DESCRIPTION
Tower Assembly
Vertical Tower Tubes
Horizontal Tower Tube
Push Through Bar
Roll Back Bar
Push Through Bar Springs
Roll Back Bar Springs
Light Arm Springs
Light Leg Springs
Cotton Loop (pair)
Storage Chain w/ Quick Link
Safety Chain w/ Quick Link
Leather Contoured Handle
Assembly (pair)
Allen Wrench, 5/32"
Allen Wrench, 3/16"
1/4-20 x 5/8" Button Screw
Eye Bolt 2-1/2" long
Lock Washer
Hex Nut, 1/4"-20
PART NO.
QTY
N/A
1
16968
2
17323
1
17598
1
17110
1
16913
3
16910
2
17109
2
17094
2
16992
1
17648
1
17649
2
17115
1
13778
1
13777
1
15223
4
13744
2
13633
2
13635
2
INSTALL THE TOWER
1. Remove the Tower tubes with Push Through Bar from the box.
Do not cut the tie between the Push Through Bar and the
tubes or else it can swing when lifting and hit you or someone
else. On the outside of the two vertical tubes there will be (2)
threaded holes, these will face out away from the machine
when installed.
2. Insert the tubes into the tower brackets on the head end of
the machine, making sure the threaded holes are facing you
when installing. Lower the tubes carefully all the way down the
tower brackets. They will touch the ground. See Figure 14.
3. Use the provided (4) 1/4"-20
x 5/8" long screws, to secure
the tubes to the brackets. It
may be necessary to slightly
lift the tube to align the
holes. Start all the screws by
hand before fully tightening.
Use the 5/32" Allen wrench
to tighten all (4) screws
to the brackets. After screws are tight, remove the tie and
packaging from Push Through Bar. Install the 2 1/2" long
eye bolts with a nut and a lock washer up against the tube in
the bottom hole of brackets. Make sure that the eye bolt is
aligned vertically when tightr.
4. Attach the Roll Back Bar Springs to the Roll Back Bar and
install the springs to the outer eye bolts on the top cross tube.
See Figure A and 15 for reference.
5. Install the Arm Springs to the desired position on the tower
and attach the handles to the springs. See Figure A and 15
for reference.
6. Install the Leg Springs to the tower on the desired eye bolts
and install the cotton loops to these springs. See Figure A and
15 for reference.
A)
B)
C)
Figure 15: A) Leg Springs (the longest springs)
B) Roll Down Bar Springs (have 2 dog clips attached)
C) Arm Springs (only 1 dog clip attached)
Figure 14
5

Publicidad

loading