Descargar Imprimir esta página

Osmofilter TM68 Manual De Usuario página 36

Ocultar thumbs Ver también para TM68:

Publicidad

Idiomas disponibles

Idiomas disponibles

FEEDBACK: This cycle occurs when brine or regenerant passed through the resin bed, producing an
exchange of calcium and magnesium ions by sodium. This process will be more or less efficient in function
of the regeneration chosen.
For our low-power equipment, the type of feedback is "upstream", so that fluid flow during the regeneration
cycle is produced from the resins bajad and "the less saturated", towards the upper thereof, so that the
period of exchange of calcium and magnesium ions for sodium ions, is carried out more efficiently and quic-
kly.
Models softeners:
CHRONOMETRIC: In chronometric softeners, feedbacks are regulated by time, eg every 5 days. Thus we
know that each regeneration inevitably occur every five days, irrespective of the water that have consumed.
Therefore, we can be regenerated without having consumed any water or perhaps if consumption was very
high, the resins are overloaded and do not eliminate the lime that can hold water, ie water we are consuming
whole lime contains before passing through the softener.
These devices generally operate by cams and are programmed with a clock.
VOLUMETRIC DELAYED: This softener is volumetric, electronic and digital. The water reclamation system
of this equipment is covered by the volume of water passing through the softener and whose information we
have obtained previously to analyze the content of lime containing water to descale, so if for example we
programmed it to regenerate when passing the 6,000 liters of water equipment, effectively only regenerate
when water consumption was of this volume, not before.
As a team with a system with the possibility of delayed regeneration, this will be effective when it is program-
med, after driving the volume of water.
RECOMMENDATIONS
Carefully follow the manual of this system.
MANDATORY: The site chosen for the installation must have:
- Red Water: Check that the pressure is at least 2.5 bar and maximum 6 bar.
- Mains: 220V - 50 Hz.
- Drain.
Before installation you must verify that the softener contains all components and they have not been dama-
ged during transport. In case you notice any damage or injury attributable to transportation must make a
timely claim to the carrier within 24 hours after receiving the equipment.
Your softener should be installed with a network pressure between 2.5 Bar and 6 Bar for higher pressures
must install a pressure reducing valve before the entry of water sediment filter (not included) located before
the softener.
Do not use hot water with the softener.
This equipment must guard against frost, rain, damp and direct sunlight. The drain where it has to
connect the softener must be below the overflow level.
The softener needs periodic maintenance. Call your installer or authorized service center.

Publicidad

loading

Este manual también es adecuado para:

Tm69Tm69 led