Descargar Imprimir esta página

Final Assembly; Wiring Diagram - Acuity Brands HOLOPHANE CORTEZ CZQ2L Manual Del Usuario

Unidad de iluminación de emergencia
Ocultar thumbs Ver también para HOLOPHANE CORTEZ CZQ2L:

Publicidad

Idiomas disponibles

Idiomas disponibles

FINAL ASSEMBLY

Connect battery and lamp plug to
4
charger board.
Units with Lamp Wires:
Connectors provided are compatible
from 18 to 10 AWG on unit and the
unit. Use a fine tip flat head
screwdriver to open the connector
jaws.
Lamp connector
Battery connector
Federal Communications
Commission (FCC) Requirements:
This device complies with Part 15 of the FCC Rules.
This device may not cause harmful interference.
PIN 3
Input
Pin
Wire
Voltage
No.
color
1
White
120V
2
Black
3
Orange
1
White
277V
2
Black
3
Orange
1
White
347V
2
Black
3
Orange
1
White
220V-
2
240V
3
Orange
*NOTE: Spare wire should be capped tuck excess wire into junction box
or dress it into the slot of mounting plate as shown in step1, page 2
(Junction Box Mounting).
INSTALLATION and WIRING (CONTINUED)
5
connector

WIRING DIAGRAM

Input from branch circuit. See label on wire
pair for voltage requirements.
NOTE: Refer table for operating voltages
PIN 2
PIN 1
Wire Label
Remarks
Neutral
Hot 120V
Hot 277V
*Spare Wire
Neutral
Hot 120V
*Spare Wire
Hot 277V
Neutral
Hot 120V
*Spare Wire
Hot 347V
Neutral
Hot 220V-240V
Install the plastic film to housing.
Connect AC input plug to charger
board.
Plastic film
AC connector
Status Indicator LED
Housing attachment to mounting
6
plate:
Make certain all wires and
connectors are routed to avoid
interference with other components.
Align latch openings on underside of
housing with latch buttons on
mounting plate. Firmly push housing
straight onto mounting plate, making
certain all four latches are fully
engaged, and the housing is closely
aligned to the mounting surface.
Battery
Lamp
Test Switch
Battery Type
NiCd – 3S1P
NiCd – 5S1P
page 3
(-)
(+)
Total Load
1.6 W
2.25 W

Publicidad

loading