INSTRUCTIONS FOR USE
A
A
B
B
C
PELLET LOADING VIA PNEUMATIC FEED SYSTEM
(optional)
The boiler is preset for pellet loading via a pneumatic feed
system.
For installation proceed as follows:
NOTE:
before proceeding turn off the boiler and disconnect the
electrical power cable
Fig. 1-2:
Remove the sheet metal lid (A) by unscrewing the two screws.
Fig. 3:
the two screws.
Fig. 4:
same position using the previously removed screws.
Fig. 5:
Secure the boiler to the external extraction and suction unit
(C) using the screws removed during lid disassembly.
- 36
-