Descargar Imprimir esta página

BONFIGLIOLI Vectron ANG210 Manual Del Usuario página 114

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5
Commissioning
The optional KP500 control unit is a practical tool for controlling the frequency
inverter and setting and displaying the frequency inverter parameters. This
unit is attached to the front of the frequency inverter.
Other ways of commissioning (e.g. by means of optional communica-
tion modules) are described in the co-applicable Operating Instruc-
tions.
Guided commissioning
NOTICE
Device damage possible
The frequency inverter may be connected to power supply every 60
GB
s. If the unit is switched on and off more frequently, it may be dam-
aged.
Disable release of frequency inverter; there may be no signals at inputs
STOA (digital input S1IND/terminal X210A.3) and STOB (digital input
S7IND/terminal X210B.2).
Turn mains voltage on.
The frequency inverter will perform a self-test.
Before the start of guided commissioning, the motor should not have
been operated, as a part of the machine data is dependent upon the
operating temperature.
When the unit is in "as-delivered" condition, "SetUP" will be displayed auto-
matically for guided commissioning. After successful commissioning, the guid-
ed commissioning can be carried out again later via the sub-menu CTRL.
114
Consider this when operating a mains contactor in jog operation
mode.
Quick Start Guide ANG
07/20

Publicidad

loading

Este manual también es adecuado para:

Vectron ang410Vectron ang510Vectron ang610