2. Remove the 2 bolts (C) and the 2 nuts (D) from the
handle holder.
D
3. Lubricate the blade pitch cable. Refer to
data on page 25 .
4. Put the blade pitch cable above the pulley and out
through the slot (E).
E
CAUTION:
blade pitch cable is in the groove of the
pulley and not on the outer side of the
pulley.
10
C
Technical
E
Make sure that the
5. Put the handle in the handle holder and install the 2
bolts (C) and the 2 nuts (D). Tighten the nuts to 24
Nm/18 lb-ft.
D
6. Loosen the blade pitch cable:
F
a) For products with blade pitch knob (F), turn the
blade pitch knob fully counterclockwise.
b) For products with Pro-Shift
®
Pro-Shift
lever fully forward.
7. Put the blade pitch cable through the blade pitch
fork.
8. Attach the cable nut to the blade pitch cable.
9. Adjust the cable nut. The adjustment is correct when
the blade pitch cable is straight when the blades
have no pitch.
C
G
®
lever (G), push the
1452 - 003 - 30.01.2023