Descargar Imprimir esta página

Agilent IDP-10 Manual Del Usuario página 199

Publicidad

Technical Information
To test the pump:
1
Run the pump for about 5 seconds. Verify that the front fan is running.
If you hear loud noises or observe labored operation, this indicates that the Tip
Seal or main O-ring are possibly out of place.
2
Disassemble and repair as necessary.
The pump is now ready to return to service.
Newly installed Tip Seals may require several hours of run time to seat properly and
NOTE
enable the pump to meet speed and base pressure specifications.
Agilent IDP-10 Dry Scroll Vacuum Pump User Manual
199

Publicidad

loading

Productos relacionados para Agilent IDP-10