Descargar Imprimir esta página

FILL-RITE NXFM100 Manual De Instalación Y Funcionamiento página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

|
Hardware Installation - Power On & Verification - NXFM100
After installing the Fill-Rite FMS hardware and restoring power to the pump, verify
the following items:
1. Power to the Hardware: (AC Power)
Check that the LEDs are illuminated on the Fill-Rite FMS circuit board. If the board
does not have power, check that the local circuit breaker has not tripped.
2. Bypass Mode:
Flip the bypass switch to "ON" on the Fill-Rite FMS circuit board and confirm that
your fuel equipment can dispense fuel. Be sure to switch to "NORMAL" mode after
you have successfully tested your equipment.
Bypass switch
3. Hardware WiFi:
Ensure that your Fill-Rite FMS hardware is successfully broadcasting a wifi
signal. On a wifi-enabled device, you should be able to identify and join a wifi
network titled "NXFM_XXXXX", where XXXXX is the last five digits of the
device's serial number.
4. Test Transaction:
Have the Fill-Rite FMS administrator create a driver profile and pin code for you,
and perform a test fueling using the Fill-Rite FMS mobile app. The Fill-Rite FMS
app may perform a firmware update on first use.
5. Check Pulse Rate:
Confirm that the volume displayed on the Fill-Rite FMS app matches the volume
of fluid being dispensed by the equipment.
If the volumes do not match, go to fms.fillrite.com, select the site in question,
click on the configuration tab, and edit the pump/relay to update the pulse rate.
Mounting Dimensions - NXFM100 & NXFM150
NXFM100
11 ¼"
5 ⅞"
NXFM150
15"
9 ⅜"
fillrite.com
FUEL MANAGEMENT SYSTEM
9 ⅜"
7 ¾"
13 ⅜"
Hardware Installation - NXFM150 Wiring
Fill-Rite FMS Hardware Power In / Power Out
Fill-Rite FMS piggybacks power off of the Hose #1 power input. Your wiring
configuration will depend on whether the pump runs on AC or DC power.
Do Not piggyback input or output wiring unless the wires are sized correctly via NEC
DC
Ensure Power Select switch is in DC position*
DC input requires ~12V DC. Attach positive power to DC+ (terminal 3), negative to
DC- (terminal 2), and earth ground to (terminal 1) as demonstrated in Figure 1.
For output power, attach the positive load wire to DC+ output (terminal 28), negative to
DC- (terminal 29), and earth ground to (terminal 30).
The NXFM150 hardware accepts up to 5 pumps or loads. For each additional pump,
please connect the input and power out on channel 2 through 5.
AC
Ensure Power Select switch is in AC position*
AC input requires 80-240V AC. Attach Line power to L/DC+ (terminal 3), Neutral to
N/DC- (terminal 2), and earth ground to (terminal 1).
For output power, attach the load line wire to the L/DC+ output (terminal 28), load
Neutral to N/DC- (terminal 29), and earth ground to (terminal 30).
* Do Not switch AC/DC power mode either direction while unit is powered on
31
Power Select AC/DC Switch
32
33
1
34
35
36
37
38
39
40
41
42
30
43
44
45
RS-485
The Site Controller and Expansion Module must be connected together through RS-485
in order to communicate. Both hardware units have 3 wiring terminals that must be
connected to each other. A, B, and GND on the Site Controller need to be connected to
A, B, and GND on the Expansion Module.
Multiple NXFM150 Modules can be linked together in a series (up to 10 modules)
using RS-485.
11"
B
A
GND
46 47 48
INSTALLATION AND OPERATION MANUAL
N/DC- N/DC+
Figure 1
2
3
4
5
6
7
8
9
10
11
12
Hose #1
Hose #2
Hose #3
Hose #4
29
28
27
26
25
24
23
22
21
20
N/DC- N/DC+
GND
A
B
13
14
15
Hose #5
19
18
17
16
6

Publicidad

loading

Este manual también es adecuado para:

Nxfm150