Descargar Imprimir esta página

Ecoflam MAX 15 Manual Del Usuario página 7

Ocultar thumbs Ver también para MAX 15:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 14
MAXIMUM LENGTHS OF SUCTION LINES FOR TWO-PIPE SYSTEM SUNTEC AS V 47 AK
Two-pipe siphon feed system
H
Two-pipe lift system
H
SUNTEC
ASV 47 AK
3
6
P
V
SUNTEC
SUNTEC
1
2
1
1
y
PRIMING AND ADJUSTMENT OF OIL PUMP
4
5
VERIFY:
- That piping system is perfectly sealed.
- That the use of hoses is avoided whenever is possible (use copper pipes prefe-
rably).
- That depression is not greater than 0,45 bar, to avoid pump's cavitation.
- That check valve is suitably designed for the duty.
The pump pressure is set at a value of 12 bar during the testing of burners.
Before starting the burner, bleed the air in the pump through
1 - HOSE
the gauge port. Fill the piping with light-oil to facilitate the
2 - OIL FILTER
pump priming. Start the burner and check the pump feeding
3 - OIL COCK
pressure. In case the pump priming does not take place during
the first prepurging, with a consequent, subsequent lock-out of the burner, rearm the
burner's lock-out to restart, by pushing the button on the control box. If, after a suc-
cessful pump priming, the burner locks-out after the prepurging, due to a fuel pressu-
re drop in the pump, rearm the burner's lock-out to restart the burner. Do never
allow the pump working without oil for more than three minutes.
Note: before starting the burner, check that the return pipe is open. An even-
tual obstruction could damage the pump sealing device.
2
3
H
(m)
ø 8 mm
0,5
1
1,5
2
2,5
3
3,5
H
(m)
ø 8 mm
0,5
1
1,5
2
2,5
3
3,5
1 - INLET
2 - RETURN
3 - BLEED AND PRESSURE GAUGE PORT
4 - VACUUM GAUGE PORT
5 - PRESSURE ADJUSTMENT
6 - TO NOZZLE
pag.7
420010396801 Max 15 - 20
Length pipe (m)
ø 10 mm
30
65
35
70
40
75
45
80
50
85
55
90
60
95
Length pipe (m)
ø 10 mm
23
55
21
50
19
45
17
40
14
34
9
28
4
22
EN

Publicidad

loading

Este manual también es adecuado para:

Max 20