Descargar Imprimir esta página

Auping Spiraalbodem 2M Manual De Instrucciones página 22

Ocultar thumbs Ver también para Spiraalbodem 2M:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 82
Press the "down" button on the
operating box to lower all the motors.
All sections of the bed will go down.
4.5 Connecting the wireless remote
control and operating box
Press the connect button on the
operating box for 2 seconds. A
single beep sound of the operating
box confirms the start of the
connecting process. Press any
button on the remote control. The
operating box will produce a
double beep sound if the
connection between remote control
and operating box is successful. Please
bed base if applicable.
EN
8

Publicidad

loading

Productos relacionados para Auping Spiraalbodem 2M

Este manual también es adecuado para:

Spiraalbodem 3m