Descargar Imprimir esta página

Riello BS1F Instrucciones De Instalación, Uso Y Mantenimiento página 17

Quemadores de gas con aire soplado

Publicidad

Idiomas disponibles

Idiomas disponibles

5
Installation
5.1
Notes on safety for the installation
After carefully cleaning all around the area where the burner is to
be installed, and arranging for the environment to be illuminated
correctly, proceed with the installation operations.
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
DANGER
5.2
Instructions to avoid burnout or bad combustion of the burner
1
The burner can not be installed outside as it is suitable for
operation in closed rooms only.
2
The premises the burner operates in must have openings
for the air need for the combustion. To be sure about this,
you have to control CO2 and CO in the exhaust gases with
all the windows and doors closed.
3
If there are air extractors in the premises the burner works,
make sure that there are openings for air to be taken in that
are big enough to ensure the required air change; In any
case, check that when the burner stops the extractors do
not draw hot fumes from pipes through the burner.
5.3
Handling
The transport weight is given in chapter "Technical data" on page
8.
Observe the permissible ambient temperatures for storage and
transport: -20... + 70°C, with max. relative air humidity 80%.
After positioning the burner near the installation
point, correctly dispose of all residual packaging,
separating the various types of material.
Before proceeding with the installation operations,
carefully clean all around the area where the burn-
er will be installed.
CAUTION
The operator must use the required equipment
during installation.
Installation
The installation of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
ATTENTION
The combustion air inside the boiler must be free
from hazardous mixes (e.g.: chloride, fluoride,
halogen); if present, it is highly recommended to
carry out cleaning and maintenance more fre-
DANGER
quently.
4
When the burner is stopped, the smoke pipe must be kept
open and a natural draft created in the combustion chamber.
If the smoke pipe is closed, the burner must be drawn back
till the extraction of blast tube from the furnace. Before oper-
ating in this way take the voltage off.
15
GB
20140262

Publicidad

loading