Descargar Imprimir esta página

Chattanooga FLUIDOTHERAPY FLU110D Manual De Usuario página 33

Publicidad

Idiomas disponibles

Idiomas disponibles

PREVENTIVE MAINTENANCE
Fluidotherapy® - Dry Heat Therapy
WEEKLY MAINTENANCE (CONTINUED)
From the outside of the unit, reach through
the sleeve and install the outer sleeve
retaining ring.
NOTE:
Start installation of the outer ring at the top
of the unit. As the ring is being seated, pull
the area of the sleeve tight. This will aid in the
prevention of excessive medium spillage and
patient comfort.
29 29

Publicidad

loading