PREVENTIVE MAINTENANCE
ADDITIONAL FLUIDOTHERAPY PREVENTIVE MAINTENANCE REQUIREMENTS
The following additional preventive maintenance requirements must be scheduled and performed as described to ensure that the unit is operating
efficiently, safely, and functioning at optimum level. A blank Maintenance Record is provided on
this prescribed preventive maintenance program. The following preventive maintenance procedures must be performed by a DJO, LLC qualified service
technician trained in the maintenance requirements of the Chattanooga Fluidotherapy units.
QUARTERLY (Every 3 Months)
The following Preventive Maintenance must be performed on all
Fluidotherapy units quarterly by a certified service technician.
• INTERNAL CAVITY INSPECTION AND CLEANING
• FULL FUNCTIONAL AND PERFORMANCE TESTS
BI-ANNUAL (Every 6 Months)
The following Preventive Maintenance must be performed on all
Fluidotherapy units every six months in addition to the Quarterly
Maintenance requirements by a certified service technician.
• CHANGE CELLEX MEDIUM
ANNUAL (Once per Year)
The following Preventive Maintenance must be performed on all
Fluidotherapy units annually in addition to the Quarterly and Bi-Annual
Maintenance requirements by a certified service technician.
• CALIBRATION
page 31
to aid in the scheduling and record keeping of
AS NEEDED
The following Preventive Maintenance must be performed only if
performance test results indicate replacement is necessary.
• INTAKE FILTER REPLACEMENT
• DISTRIBUTOR REPLACEMENT
• BLOWER MOTOR(S) REPLACEMENT
•
If the level of Cellex medium suddenly drops one inch or more
below the operating level of the unit, immediately pull the unit out
of service and contact a certified service technician.
•
A sudden level drop in the Cellex medium may indicate that
medium is leaking into the heating chamber of the unit and must
be repaired before the unit is placed back into service.
30
Fluidotherapy® - Dry Heat Therapy