Descargar Imprimir esta página

Parkside PAPK 12 A3 Traduccion Del Manual De Instrucciones Originale página 64

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

GB
MT
battery and pull the battery
out.
2. To insert the battery (1),
push the battery along the
guide rail into the device.
You will hear it click into
place.
Only insert the re-
chargeable battery
once the battery-
operated tool is ready for
use.
Checking the battery
charge level
The battery's (1) charge level is
indicated by the charge state
indicator.
• The charge level of the
battery is indicated by illumi-
nation of the corresponding
LED lights while the device is
in operation. Press and hold
the power button to view.
red-yellow-green => Battery
fully charged
red and yellow => Battery half
charged
red => Battery needs
to be charged
64
Recharging the battery
If warm, allow the bat-
tery to cool before char-
ging.
Charge the battery (1)
when only the red LED
on the level indicator is
illuminated.
The battery's (1) charge
level is indicated by the
charge state indicator.
1. Remove the battery (1) from
the
appliance if necessary.
2. Plug the battery charger (3)
into a mains outlet.
3. Insert the battery (1) in the
charging compartment of
the battery charger (3).
4. Pull the battery (1) out of the
battery charger (3).
5. Unplug the battery charger
(3) from the mains.
Overview of the LED indi-
cators on the charger (3):
battery inserted: Charger rea-
dy.
Green LED (5)
lights up without

Publicidad

loading

Este manual también es adecuado para:

Plgk 12 a2