Yamaha F100A Manual De Servicio página 400

Ocultar thumbs Ver también para F100A:
Tabla de contenido

Publicidad

+
ELEC
Å
ı
1
ELECTRICAL ANALYSIS
2
3
When measuring the peak voltage, con-
nect the peak voltage adaptor to the digi-
tal tester and switch the selector to the
DC voltage mode.
NOTE:
Make sure that the adaptor leads are
properly installed in the digital circuit
tester.
Make sure that the positive pin (the "+"
mark facing up as shown) on the adaptor
is installed into the positive terminal of
the tester.
The test harness is needed for the follow-
ing tests.
Å Voltage measurement
ı Peak voltage measurement
Test harness
YB-
90890- Pin
1
06443
06757
2
38832
06772
3
06770
06770
Checking steps:
Disconnect the coupler connections.
Connect the test harness between the
couplers.
Connect the tester terminals to the ter-
minals which are being checked.
Run the engine and observe the mea-
surement.
8-7
E
Usage
3
Throttle position
sensor (TPS)
6
Pick-up coil
3
Charge coil

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

F100x

Tabla de contenido