Descargar Imprimir esta página

CF Vitalia SWITCH CONNECT Manual De Instalación página 11

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 43
SERVICING
• Prior to any operation, switch off and lock the mains power supply.
• Prior to any wiring operation: check and, if required, tighten the screws of the
appliances.
Any maintenance operations shall be limited to replacing the fuse that protects the
electronic board. This safety device cannot be replaced without having first determined
and corrected the exact cause(s) of the malfunction. If you have any doubts and for any
operations, contact a professional electrician (an invoice will be required for any return
under warranty).
We advise you to regularly check that all connections are correctly tightened (preferably
at the start of every season).
When cleaning your technical room, make sure that no water splashes onto any of your
electrical appliances and especially your control boxes. Furthermore, do not use any
corrosive products that may damage plastic components (acid, solvent, etc...
SERVICING/MAINTENANCE
10

Publicidad

loading