Descargar Imprimir esta página

CF Vitalia SWITCH CONNECT Manual De Instalación página 4

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 43
The SWITCH CONNECT clock has to be installed in a pool's control box, replacing a
conventional clock, and it allows you to control the filtration pump, pool lighting and
a second pump with the option of coupling it to filtration for booster pumps. Optional
information on water and air temperatures can also be provided. The SWITCH CONNECT
clock can be switched to maintenance mode, allowing manual control of all the devices
it manages, without requiring use of a Smartphone.
• Wear safety equipment (safety shoes, goggles, mask, gloves, appropriate
clothing) when installing the equipment.
• Consult the instructions provided by the manufacturer(s) for power tools and
products used.
• Prior to any operation, switch off and lock the mains power supply.
• Prior to any wiring operation: check and, if required, tighten the screws of the
appliances.
Prior to any wiring operation, a differential circuit breaker of 30mA maximum must be put
in place before installation of the pool, and there must be connected earth-grounding of
a value lower than the regulatory threshold (usually <100 Ω, we recommend lowering this
threshold to 50Ω).
Electrical connections must be installed by a qualified electrician according to the
applicable installation norms (NF norm C 15-100 for France).
PROTECTIVE MEASURE FOR PEOPLE
• Against direct contact from the casing.
• Against indirect contact from use of the circuit breaker.
Operational voltage rating: Ue = 230V
Protection factor: IP20
Earthing system: TT
Frequency: 50Hz
Rated power: I = 1A
CHARACTERISTICS OF DRY CONTACTS
Configuration of contacts: norm opened (NO)
Maximum switching voltage: 250V AC
Maximum power in AC1: 900W
Maximum power in AC3: 140W
Check that the voltage indicated on the device corresponds to that of your network:
single-phase: 230V ~ 50Hz (1 phase + 1 neutral + 1 earth).
SAFETY INSTRUCTIONS
3

Publicidad

loading