INSTRUCTIONS START HERE
1. Prepare ceiling cut-out with the dimensions :
2300W - 995mm x 240mm (39.2" X 9.4")
3400W - 1430mm x 240mm (56.3" X 9.4")
4500W - 1550mm x 317mm (61.0" X 12.5")
Heater must be installed with heater surface at least 2400mm
(94") above the finished floor (AFF), with minimum clearance
measured from the terminal box end to the nearest surface being
200mm (7.9"). Minimum heater to heater distance measured
from edge of heater must be 500mm (19.7"). Refer to the install
dimensions on page 3.
Before proceeding with Step 2.
NOTE: Access to cavity space through recess box is restricted.
NOTE: Installations with Bromic controllers in cavity space.
Consider location requirements of Bromic controllers and how
to access the Bromic controllers and its wiring before fitting the
LC cavity recess box to the ceiling. Refer to page xx for wiring
diagram and Controller manual for mounting and sizing details.
2. Fasten the ceiling recess box into ceiling with 6x (minimum)
appropriate fasteners (not supplied) along the long edge.
NOTE: The fastening screws must be inserted into a strong
material that can easily support the weight of the assembly. Your
installation may require re-enforcing before the frame can be
safely installed.
IMPORTANT
It is the installers responsibility to ensure that the
installation site is structurally suitable for the mass of the
heater installation being 18.5kg (41 lb) [2300W], 24kg
(53 lb) [3400W] or 25kg (55.1 lb) [4500W].
MINIMUM 10 FASTENERS TO BE USED FOR TIMBER
MEMBERS.
3. Assemble 2x vent covers together using the vent cover trims
and 4x
M3x6mm screws. The colour of the vent covers are to
match the heater.
4. Install the assembled vent covers to the end of trim assembly
using 4x
M4x8mm screws.
M6x14mm and 2x
5. Remove the 2x
rear bracket of the heater. Remove the swivel bracket on the
heater rear. Loosen the
(4500W) cable gland using a 24mm (15/16") or 30mm (1/1/8")
spanner and install the removed cable gland onto the IP cover.
ENSURE THE CABLE GLAND NUT IS REINSTALLED ON THE
INNER SURFACE OF THE IP COVER.
NOTE: During this process the strain relief
device has been removed - Care must be taken
to not apply significant load to the cable as
this could stress the internal cable crimps and
permanently damage the heater.
M4x8mm screws on the
M16 (2300W/3400W) or
M20
bromic.com
24mm
(15/16")
30mm
(1/1/8")
5