AirConServiceCenter
8.6.3 Filling process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Filling phase" has been selected, enter the required value, other-
wise continue with "Select connections".
3. Enter the amount of refrigerant oil which was previously drained or
which is required.
4. Press the cursor key
5. Enter the additive quantity.
6. Press the cursor key
7. Enter the refrigerant quantity.
8. Press ENTER to confirm all settings.
NOTE
I
If extraction is taking place in the same process sequence, the quantity of
fresh oil is counted as an additional filling quantity, and is added to the
drained oil quantity extracted beforehand. If this value is set to 0, exactly
the quantity of oil which was extracted will be filled again.
To add fresh oil or UV additive, a vacuum process must be performed in
the same process sequence. If no vacuum process has been selected,
only refrigerant can be selected in the filling menu.
EN
LP
phase?
ENTER-OK STOP-EXIT
.
.
PAG oil
UV tracer
Refrigerant
ENTER-OK STOP-EXIT
Yes
No
ml.
0
ml.
7
g.
500
Operation
101