7. Install the Actuator Rods and Frame
1/8"
(3 mm)
Min
Finished
Wall
Thread the push rods into the actuator assembly 1/8" (3 mm) beyond the finished wall.
If needed, trim the threaded end of the push rods.
Secure the push rods in place by tightening the push rod nuts.
Install the four locking pins into the mounting frame.
Turn the locking pins to the "Open" position.
Align the mounting frame with the flush valve opening, and install the mounting frame against the finished wall.
If needed, trim the locking pins.
Turn the locking pins to the "Lock" position.
Proceed to the bowl Installation Instructions to complete the installation.
1247365-2-C
Nuts
10
Open
Lock
Kohler Co.