2. Prepare the Carrier
Front View
NOTE: If using 2x6 studs, install the mounting frame into the back notches.
Set the carrier face down on the floor.
Using a hex wrench, loosen the nuts securing the legs to the carrier.
Raise the carrier 8" (203 mm) - 10" (254 mm) high to allow access to the feet.
Tighten the nuts securing the legs to the carrier.
Install the mounting frame into the front notches on the bottom of the carrier.
Insert the elbow into the mounting frame.
Secure the elbow in place with the drain clamp. Press the clamp into the frame until it locks into place.
Kohler Co.
Mounting
Frame
PVC
Elbow
Drain
Clamp
2x4
2x6
5
Back View
1247365-2-C